2026.01

Design with planning and Building Regulations confidence.

Since the Building Safety Act, compliance is the designer's responsibility. QCheck turns the Approved Documents into interactive checks on your own plans, records every design decision, and exports marked-up drawings ready for building control.

  • Design with confidenceCheck as you design, not after. When you know exactly where the line is, you can push right up to it.
  • A record of every decisionEach check leaves a trail of what was tested, against which Approved Document, and by whom.
  • Drawings building control can readMarked-up sheets with a clear key, so the reasoning is seen at a glance.

The guidance behind every drawing.

© 2026 Chen Qi · All rights reserved · QCheck is a design aid: responsibility for compliance stays with the dutyholder.

Evidence that fits the codes you answer to.

Every QCheck sheet records what was tested, against which guidance and edition, by whom and when. That record supports the duties below. It does not replace your judgement.

ARB

Architects Code, 2025

The Code asks architects to work competently, with skill and diligence. Each check names the guidance and edition it was tested against, so your reasoning can be shown.

RICS

Rules of Conduct, 2022

The Rules ask for competence and a diligent, good quality service. A marked-up sheet shows what was measured, how it was measured and the limit it was set against.

RTPI

Code of Professional Conduct, 2023

The Code asks for reasonable skill, knowledge and care, and for independent judgement. Planning checks are set against the published standard, and gaps read Not assessed.

PRINCE2

Project management method

PRINCE2 manages by stages and focuses on products with agreed quality criteria. A dated, revisioned check sheet is a quality record for each design issue.

HSE

CDM 2015 and L24

CDM asks designers to eliminate, reduce or control foreseeable risks and to pass information on. Results and design notes travel with the drawing. Workplace checks use L24.

SMSTS

Site Management Safety Training Scheme

Site managers trained under the scheme plan and supervise work from clear information. One sheet, one key and a source for every figure make design stage checks readable on site.

Three assurances behind every record

No AI slop

QCheck uses no AI of any kind. Every result is replicable and referenced directly to the policy it comes from. It helps dutyholders make critical decisions, so safety is never left to an AI hallucination.

No Data risk

QCheck runs locally in your browser and uploads nothing. Work on sensitive client information knowing your data is never used for training or analytics. Contact me directly to find out how the tool is built and verified.

No Barriers

Experienced designers can jump straight into the tools and switch the guidance off. Everyone else can use QCheck to learn: each tool explains how to measure before it asks for a figure.

QCheck is independent. It is not endorsed by, or affiliated with, any of these bodies. Following guidance does not guarantee compliance.

© 2026 Chen Qi · All rights reserved · QCheck is a design aid: responsibility for compliance stays with the dutyholder.

I amChoose a role: dutyholder, stakeholder or end user

a traditional contractor

Dutyholder: contractor

As contractor or principal contractor under Part 2A of the Building Regulations 2010, you must carry out the work so that it complies with all relevant requirements. Settle on-site building control queries and design debates with the Approved Document guidance set out as cold, hard annotated drawings.

© 2026 Chen Qi · All rights reserved · QCheck is a design aid: responsibility for compliance stays with the dutyholder.
Chen Qi

Hi, I'm Chen Qi the person behind the tool.

ArchitectPlanning consultantPRINCE2 certified

In today's building industry landscape, an ambitious concept drawing that wins work can quickly become a slow process of scope creep, variations and a compliance nightmare when Building Regulations and planning policy checks do not start at RIBA Stage 0.

This tool has one goal: empower designers and prevent tragedies. When regulations are confusing, and correcting them means losing a project or a client, people slide non-compliant drawings under the table.

Instead, design from the get-go with confidence, with evidence of compliance, and streamline any regulation-related problem solving.

As an award-winning architect, I have spent years in the industry delivering projects closely with project managers, contractors and engineers, and learned that great design comes with buildability, viability and compliance confidence. The built environment is a world where confidence on site is demanded, and when regulations are not clear and easily interpreted, that same confidence becomes “Nah mate, don't worry about it, we have always done it like this”.

With a background in architecture, planning and game design, I saw a clear gap to fill: a tool that is as interactive and intuitive as it is rigorous and policy based. This is exactly why no AI functions exist: it empowers you to make decisions, it does not make them for you.

We always welcome feedback and involvement. Currently, we are looking for input from:

  • RIBA registered Principal Designers
  • Local authorities and government ALBs
  • Charities and advocacy groups
  • SME founders
  • Registered Building Control Approvers and Inspectors

Get in touch, and make a difference in the built environment.

© 2026 Chen Qi · All rights reserved · QCheck is a design aid: responsibility for compliance stays with the dutyholder.

Load a drawing to start

Drop a PDF here or pick one. Multi-page sets are fine, and every page can be marked up. Or start on a blank A3 sheet to try the tools or draw from scratch.

Your drawing is read in this browser and is not uploaded.
A design aid, not a compliance sign-off. The duty holder remains responsible for verifying every result.